enwater >> news
|
Beijing north shing JHF animal drinking water system maintenance project - purified water equipment maintenance
|
Purified water system since 2016 has been installed to the now for more than 5 years time to run stable, in order to later system stable operation and Suggestions on the system for regular maintenance. Maintenance project work content: 1, according to the maintenance service content listed in detail, for the maintenance service plan; 2, arrange at least once a month the scene maintenance, maintenance, maintenance; 3, annual replacement of quartz sand, activated carbon, to ensure the water quality; 4, each equipped with supplementary resin, to guarantee the water softening index; 5, maintenance personnel every six months the pretreatment control valve action is checked, to ensure they work; 6, every quarter for cleaning equipment; 7, each quarter of dosing pump inspection, to ensure they work; 8, monthly soft water hardness test, direct judgment soft water hardness results, confirm whether normal operation control valve group, whether the resin failure; 9, to clean the uv lamp every quarter, annual change the uv lamp; 10, once finish 1 year purified water testing water samples and inspection work, at least to collect equipment outlet, water mouth water samples of 2 or more, and to provide the qualified inspection reports issued by national authoritative organization; 11, quarterly maintenance, reported to the main components operation condition, put forward reasonable Suggestions; 12, every year chemistry or ozone disinfection of the original, pure water tank cleaning, reduce bacteria growth, prevent the secondary pollution of product water; 13, commitment to general breakdown maintenance 8 hours door-to-door service, emergency breakdown maintenance 4 hours door-to-door service; 14, free to the customer for equipment operation and maintenance training, and provide relevant equipment in detail; |